Menu

AROONA strengthens staff efficiency and quality of care

Dracy-le-Fort Orthopedic Center, France

Dracy 1150x500
The issue

The Dracy-le-Fort orthopedic center deployed digitization of patient records, a shared storage server, connected medical equipment and imaging systems. As a result, it is facing high volumes of data traffic throughout its entire network. The 250m [820 ft] OM2 fiber optic link, situated between the main building and the rehabilitation building, is limited to 1 Gb/s and in need of an upgrade. In addition, having few available fibers, the center wishes to multiplex in order to increase network capacity, without disrupting services or causing work-related disturbances.

The AROONA solution

Cailabs’ AROONA passive solution makes it possible to restore the existing fiber link, all the while respecting the particular constraints of a health facility. The number of links is multiplied by 4: services continue to run as usual and the absence of work prevents dust and various disturbances. All this makes AROONA more advantageous than fiber redeployment.

The benefits of the solution
  • 4 x 10 Gb/s instead of being limited to1 Gb/s
  • Respects the upgrade project budget, as opposed to fiber redeployment
  • 3 hour installation time, without interrupting services and without dust

Our other case studies Fiber Optic Networks:

AROONA facilitates innovative digital solutions for universities
Fiber Optic Networks AROONA facilitates innovative digital solutions for universities More info
AROONA breathes new life into obsolete fiber-optic cables
Fiber Optic Networks AROONA breathes new life into obsolete fiber-optic cables More info
City Of Montmagny, France
Fiber Optic Networks Providing broadband to a local municipal network with AROONA More info
Cerema Et Ibm
Fiber Optic Networks An ecological LAN in public establishments with AROONA More info
2 Alpes Ski Resort
Fiber Optic Networks AROONA serves digitization of ski resorts More info