Menu

AROONA strengthens staff efficiency and quality of care

Dracy-le-Fort Orthopedic Center, France

Dracy 1150x500
The issue

The Dracy-le-Fort orthopedic center deployed digitization of patient records, a shared storage server, connected medical equipment and imaging systems. As a result, it is facing high volumes of data traffic throughout its entire network. The 250m [820 ft] OM2 fiber optic link, situated between the main building and the rehabilitation building, is limited to 1 Gb/s and in need of an upgrade. In addition, having few available fibers, the center wishes to multiplex in order to increase network capacity, without disrupting services or causing work-related disturbances.

The AROONA solution

Cailabs’ AROONA passive solution makes it possible to restore the existing fiber link, all the while respecting the particular constraints of a health facility. The number of links is multiplied by 4: services continue to run as usual and the absence of work prevents dust and various disturbances. All this makes AROONA more advantageous than fiber redeployment.

The benefits of the solution
  • 4 x 10 Gb/s instead of being limited to1 Gb/s
  • Respects the upgrade project budget, as opposed to fiber redeployment
  • 3 hour installation time, without interrupting services and without dust

Our other case studies Fiber Optic Networks:

Blancheporte Tourcoing Parking Siège Social
Fiber Optic Networks Mail order company Blancheporte, France More info
AROONA enables implementation of new ERP system | Fromagerie Ermitage
Fiber Optic Networks AROONA enables implementation of new ERP system More info
Photo of Marburg, Germany's old city
Fiber Optic Networks AROONA upgrades your city’s network infrastructure More info
University Of Southern California
Fiber Optic Networks The PROTEUS-C solution improves free space optical communication with airborne platforms More info
Hopital De Digne Les Bains 1150x500
Fiber Optic Networks AROONA enables the implementation of video surveillance in hospitals More info