Menu

AROONA enables implementation of new ERP system

Ermitage cheese dairy, France

AROONA enables implementation of new ERP system | Fromagerie Ermitage
The issue

The Ermitage cheese dairy is based in Pays de Clerval. Its plant in Clerval-Ermitage has an OM1 multimode fiber infrastructure (62.5/125) with a maximum throughput of 100 Mbps. This limitation prevented the rollout of a new ERP system with a minimum throughput requirement of 1 Gbps. A standard rip-and-replace upgrade was not feasible because the existing cable trenches could no longer be accessed.

The AROONA solution

Ermitage decided to install a compact AROONA-STAR module to increase the throughput of one of its 300 m multimode links from 100 Mbps to 1 Gbps. This passive solution was identified as an alternative to major upgrade works since the optical fiber could not be replaced.

The benefits of the solution
  • Cost effective: no expensive optical fiber replacement
  • No constraints: service interruption limited to 1 hour

Our other case studies Fiber Optic Networks:

AROONA serves the Frederikssund Municipality's networks in Denmark
Fiber Optic Networks AROONA serves a Municipality’s networks More info
City Of Montmagny, France
Fiber Optic Networks Providing broadband to a local municipal network with AROONA More info
Dracy 1150x500
Fiber Optic Networks AROONA strengthens staff efficiency and quality of care More info
AROONA breathes new life into obsolete fiber-optic cables
Fiber Optic Networks AROONA breathes new life into obsolete fiber-optic cables More info
Photo of Marburg, Germany's old city
Fiber Optic Networks AROONA upgrades your city’s network infrastructure More info